PCS, Inc. was contracted by Signature Renovations, LLC to provide interior demolition in conjunction with asbestos abatement, mold remediation and PCB removal in Building 9 of the FBI Academy. PCS removed PCB-contaminated condensing units, 3600SF of contaminated floor tile/mastic, and asbestos-contaminated pipe insulation. Crews remediated mold-infected areas throughout the basement as well. Demolition crews removed interior carpet, ceilings, floor tiles, walls, sinks, and showers.