PCS, Inc. is on site this week providing selective demolition services in Building 832 at Fort Detrick. PCS was contracted to remove and dispose of doors, frames, flooring, lights, plumbing fixtures and MEP within the building. Demolition crews are utilizing a John Deere 160G Excavator to remove 6” of concrete foundation, including 3-foot footers. Prior to beginning the work, demolition crews were properly trained on how to operate the excavator safely and efficiently.