Renovations are underway in Robert Hall at Bucknell University where PCS, Inc. was contracted to provide selective demolition and asbestos abatement services throughout the building. Abatement crews removed asbestos-containing materials from the building and selective demo crews gut the interior of the building, removing flooring, ceiling, drywall, plumbing & light fixtures, doors, frames, windows, and mechanical ductwork. Our specialized team also performed saw cutting in preparation for a new elevator and core drilling in preparation for new mechanical, electrical and plumbing required.