York Hospital Emergency Power Upgrades

portfolio
portfolio
Project Info
  • Construction Date: November 2013
  • Location: York, PA
  • Category: Healthcare
Project Details

PCS, Inc. was contracted by Alexander Construction Co. to to perform emergency power upgrades in the East Wing of York Hospital. PCS demolition crews safely removed and disposed of the mechanical piping, ductwork and insulation from the basement of the facility. Our specialized saw cutting team saw cut new openings for incoming HVAC equipment.

Enter your keyword