PSU McCoy Natatorium Pool Renovation

Project Info
  • Construction Date: Multi-phase
  • Location: University Park, Pennsylvania
  • Category: Institutional
Project Details

PCS, Inc. was contracted by Main Line Commercial Pools, Inc. to provide selective demolition and saw cutting services as part of a two-phase renovation to the 6-lane swimming pool in the McCoy Natatorium Complex. PCS demo crews removed ceramic tile and set bed/ironite on the pool floor, walls and deck. In preparation for the installation of new floor drains, our saw cutting team removed portions of the concrete floor that were 12” thick.

Enter your keyword