NPL Operations Center Abatement

Project Info
  • Construction Date: October 2014
  • Location: Baltimore, MD
  • Category: Industrial
Project Details

PCS, Inc. completed an abatement job at the NPL Operations Center in Baltimore for NTC Mazzuca Contracting. Our abatement crews setup a work area with critical barriers, negative pressure and a 3 stage decontamination chamber to safely remove and dispose of 8,000 SF of asbestos-containing VAT and associated mastic. They also removed pipe insulation via the glove bag method and removed mastic with a low odor chemical adhesive.

Enter your keyword