Project Info
  • Construction Date: September 2014
  • Location: Silver Spring, MD
  • Category: Healthcare
Project Details

PCS, Inc. was contracted to provide asbestos abatement services on the Holy Cross Hospital campus. Abatement crews removed and disposed of 12 foot long, 4” diameter asbestos transite conduits within a 20” x 20” x 12’ poured concrete duct bank inside a manhole. As with all of our projects, safety is very important and extra caution will be taken to complete the work inside the manholes. Caution tape, orange cones, pre-cleaning, and sump pumps installations are all part of our safety measures for this project. PCS, Inc. also installed seven 4’x4’ cross beams on top of the manhole walls perpendicular to the duct bank.