Columbia Swim Center Waterslide Demolition

Project Info
  • Construction Date: June 2016
  • Location: Columbia, MD
  • Values: 74K
  • Category: Commercial
Project Details

PCS. Inc.was contracted by Barton Malow to assist in renovations to the Columbia Association Swim Center, which included demolishing and disposing of two 42-foot high waterslides. Both slides, each averaging 270 feet in length, and its steel supports were removed one manageable section at a time and were supported by nylon lifting straps. These straps were attached to a crain hook attachment mounted to the forks of a 10,000 pound capacity shooting boom forklift. The fiberglass and steel were cut with reciprocating saws and unbolted as needed from the basket of a 60-foot man lift. Sections were then lowered to the ground, transported to waste disposal cans and minimized with a skid steer loader and a Bobcat mini excavator.

Enter your keyword