AOC Capitol Power Plant Upgrades

Project Info

Date: Multi-phase

Location: Washington, D.C.

Category: Federal

Project Details

PCS, Inc. was contracted by Kiewit Building Group, Inc. to abate and demolish materials throughout the Power Plant during the multi-phase upgrade. Crews removed all electrical equipment from the ceilings and walls, abated LBP and then repainted with encapsulating paint. PCS removed exterior windows and abated LBP and contaminated caulk around the window frames. Crews demolished various PCB contaminated materials, including a chain-link fence, metal awnings, contaminated soil, and a 12’x12′ concrete pad. Crews also removed and disposed of ACM piping, insulation and beams found throughout the facility.